Mechanic's lien deadlines by state

A lien is your strongest tool when a homeowner won't pay, and the easiest to lose. In some states you lose it on day one if you skip a notice.

Published November 5, 2026 · Updated November 6, 2026 · by Settle

Quick answer

If you worked directly for the homeowner, most states give you 60 to 180 days after your last day of work to file a lien, and then a set time, often 6 months to 1 year, to sue to enforce it. The shortest windows are Hawaii (45 days after completion), Ohio and Indiana (60 days on a 1–2 family home) and New Jersey (a notice within 60 days, then arbitration). The bigger trap is up front: in Arizona, Arkansas, Iowa, Michigan, Minnesota, Missouri, Oregon, Rhode Island, Utah, Washington and Wyoming, skipping a notice or contract step at the start of the job can cost you the lien before you've done any work. This is a summary for a contractor hired by the owner, not legal advice.

Settle is a free iPhone app for solo contractors: estimates and invoices you text from the job, with a pay link for card, Apple Pay or bank. Get it on the App Store

Want a date? The lien deadline calculator counts it from your last day of work.

Jump to your state: Alabama · Alaska · Arizona · Arkansas · California · Colorado · Connecticut · Delaware · District of Columbia · Florida · Georgia · Hawaii · Idaho · Illinois · Indiana · Iowa · Kansas · Kentucky · Louisiana · Maine · Maryland · Massachusetts · Michigan · Minnesota · Mississippi · Missouri · Montana · Nebraska · Nevada · New Hampshire · New Jersey · New Mexico · New York · North Carolina · North Dakota · Ohio · Oklahoma · Oregon · Pennsylvania · Rhode Island · South Carolina · South Dakota · Tennessee · Texas · Utah · Vermont · Virginia · Washington · West Virginia · Wisconsin · Wyoming

The rules in every state

For a solo contractor hired directly by the owner of a single-family home they live in. Rules for subcontractors and suppliers are different and usually stricter.

StateNotice before or during the jobDeadline to file the lienDeadline to sueSource
AlabamaNo preliminary notice needed by a contractor hired directly by the owner.Verified statement filed in county probate office within 6 months after last work or materials.Suit within 6 months after the whole debt becomes due.Ala. Code §§ 35-11-215, 35-11-221
AlaskaNo pre-lien notice required of a direct contractor; a recorded notice of right to lien (AS 34.35.064) is optional but protects against a short notice-of-completion window.Record within 120 days after finishing the contract; if owner records a notice of completion, can shrink to 15 days for those who gave no notice of right to lien.Suit within 6 months after recording; extendable 6 months by recording an extension notice.AS 34.35.068, 34.35.080
ArizonaPreliminary 20-day notice required of everyone but wage laborers, including direct contractors, within 20 days of first work. Owner-occupied homes: only direct contractors can lien.Record within 120 days after completion, or 60 days after owner records a notice of completion.Suit and lis pendens within 6 months after recording.A.R.S. §§ 33-992.01, 33-993, 33-998, 33-1002
ArkansasResidential (1-4 units): ’IMPORTANT NOTICE TO OWNER’ must be given before work starts, by hand or certified mail, or no lien. Also 10-day notice to owner before filing.File within 120 days after last work or materials.Suit and lis pendens within 15 months after filing.Ark. Code Ann. §§ 18-44-114, -115, -117, -119
CaliforniaDirect contractors need no preliminary notice. Home improvement contracts must carry the lien notice to owner, but that is a licensing rule, not a lien step.Record after completion and by the earlier of 90 days after completion or 60 days after owner records notice of completion or cessation.Suit to foreclose within 90 days after recording.Cal. Civ. Code §§ 8412, 8460
ColoradoNotice of intent to file must be served on owner (personal or certified mail) at least 10 days before filing; affidavit of service recorded with lien.File within 4 months after last labor or materials.Suit within 6 months after the later of last work/materials or completion of the improvement.C.R.S. §§ 38-22-109, 38-22-110
ConnecticutNo pre-lien notice for a direct contractor. Copy of the recorded lien must be served on owner within 30 days after recording.Record within 90 days after ceasing work or materials.Suit and lis pendens within 1 year after recording.Conn. Gen. Stat. §§ 49-34, 49-39
DelawareNo pre-lien notice found for a direct contractor.Statement of claim filed in Superior Court within 180 days after completion (or other listed triggers, e.g. final invoice).Filing the statement is itself the suit; it proceeds by writ of scire facias under court rules. No separate suit deadline found.25 Del. C. §§ 2711, 2712, 2714
District of ColumbiaNo preliminary notice. Mail owner a copy of the recorded notice of lien by certified mail within 5 business days (post on property if returned).Record notice of intent during work or within 90 days after the earlier of completion or termination.Suit within 180 days after recording the notice; lis pendens to follow.D.C. Code §§ 40-301.02, 40-303.13
FloridaNo notice to owner for a direct contractor. Residential (1-4 units) contracts over $2,500 must include the 713.015 lien notice. Final contractor’s affidavit due 5+ days before suit.Record within 90 days after final furnishing of labor or materials.Suit within 1 year after recording (owner can shorten to 60 days with a notice of contest).Fla. Stat. §§ 713.015, 713.06, 713.08, 713.22
GeorgiaNo pre-lien notice for a direct contractor. Send owner a copy of the filed lien by certified mail or overnight within 2 business days.File within 90 days after completing work or furnishing materials.Suit within 365 days after filing, plus a notice of commencement of lien action filed within 30 days of suit.O.C.G.A. §§ 44-14-361.1, 44-14-367
HawaiiNo preliminary notice. Lien starts by filing an application in circuit court, served on owner. Residential contracts must disclose lien rights (HRS 444-25.5).File application within 45 days after the date of completion (published notice of completion sets the date).Suit within 3 months after the court’s order directing the lien to attach.Haw. Rev. Stat. §§ 507-43, 507-47
IdahoResidential jobs over $2,000: disclosure statement to homeowner before contracting (consumer-law penalty, not stated as a lien bar). Serve copy of lien on owner within 5 business days.File within 90 days after completing labor or furnishing materials.Suit within 6 months after filing.Idaho Code §§ 45-507, 45-510, 45-525
IllinoisNo pre-lien notice for a direct contractor. Owner-occupied single-family: written sworn-statement notice due before first payment (60/5(b)); not stated as a lien bar.Record within 4 months after completion to bind third parties; against the owner, within 2 years after completion.Suit within 2 years after completion.770 ILCS 60/5, 60/7, 60/9
IndianaNo preliminary notice for a direct contractor. County recorder mails owner a copy of the filed lien.Residential (Class 2, i.e. 1-2 family) jobs: file within 60 days after last labor or materials; 90 days for other property.Suit within 1 year after recording (or 30 days after owner’s written demand to sue).Ind. Code §§ 32-28-3-3, 32-28-3-6
IowaResidential: general contractor must post a notice of commencement on the state lien registry (MNLR) within 10 days of starting work, or no lien.Post lien on MNLR within 90 days after last labor or materials; later posting is allowed but only reaches sums owner has not yet paid.Suit within 2 years after the 90-day posting period ends.Iowa Code §§ 572.9, 572.13A, 572.27
KansasNo preliminary notice for a direct contractor (residential warning statement applies to subs and suppliers under 60-1103a).File within 4 months after last labor or materials; extension by notice only for non-residential property.Suit within 1 year after filing.K.S.A. §§ 60-1102, 60-1105
KentuckyNo pre-lien notice for a direct contractor (75-day notice rule is for subs on owner-occupied homes). Mail owner a copy of the lien within 7 days of filing, or the lien dissolves.File with county clerk within 6 months after last labor or materials.Suit within 12 months after filing.KRS §§ 376.010, 376.080, 376.090
LouisianaNone for most home jobs. If the contract is over $100,000, a notice of contract must be filed before work starts or you have no lien (R.S. 9:4811).File statement of claim within 60 days after owner files notice of termination, or after substantial completion/abandonment if none is filed.Sue the owner within 1 year after filing the statement of claim, or the privilege is extinguished.La. R.S. 9:4811, 9:4822, 9:4823
MaineNone for a contractor hired by the owner. No lien statement is needed either when you contract directly with the owner (§3253(2)).No recording needed for a direct contract with the owner; the lien is preserved by filing suit (below).Sue in Superior or District Court within 120 days after your last labor or materials.10 M.R.S. §§3253, 3255
MarylandNone for a contractor hired by the owner. The notice of intent to lien (§9-104) is for subcontractors only.File a petition to establish the lien in circuit court within 180 days after you finish the work.The lien expires 1 year after the petition is filed unless a petition to enforce is filed within that year.Md. Code, Real Prop. §§9-104, 9-105, 9-109
MassachusettsNo notice before work. Record a notice of contract at the registry of deeds within 90 days after last work (sooner if owner files a completion/termination notice).Record a sworn statement of account within 120 days after last work (90 days after a notice of substantial completion; 120 after termination).Start a civil action within 90 days after filing the statement, and record an attested copy of the complaint within 30 days of filing it.M.G.L. c.254 §§2, 8, 11
MichiganNo notice of furnishing for the prime. Residential: no lien without a written contract that states your license and license number (§114).Record the claim of lien within 90 days after your last labor or materials. Serve a copy on the owner within 15 days after recording.Foreclose within 1 year after recording. You must give the owner a sworn statement before you can sue (§110(9)).MCL 570.1110, 570.1111, 570.1114, 570.1117
MinnesotaRequired: a pre-lien notice in the written contract, or delivered within 10 days after the work is agreed upon. Without it you have no lien (§514.011 subd.1).Record the lien statement within 120 days after your last work, and serve a copy on the owner (in person or certified mail) within the same 120 days.Start the enforcement action within 1 year after the last item of work on the lien statement.Minn. Stat. §§514.011, 514.08, 514.12
MississippiNone for a contractor hired by the owner. The residential pre-lien notice (§85-7-409) is for subcontractors.File the claim of lien with the chancery clerk within 90 days after your last work. Mail a copy to the owner within 2 business days.Start a payment action within 180 days after filing the lien. If the owner files a notice of contest, sue within 90 days of it (§85-7-423).Miss. Code §§85-7-405, 85-7-421, 85-7-423
MissouriRequired: a bold ’NOTICE TO OWNER’ given before any payment (in the contract, at delivery, at start, or on the first invoice). No notice, no lien (§429.012).File the lien statement within 6 months after the debt accrues.Start the suit within 6 months after filing the lien.RSMo §§429.012, 429.080, 429.170
MontanaNone: an original contractor working directly for the owner, at the owner’s request, is exempt from the notice of right to claim a lien (§71-3-531(1)(a)).File the lien within 90 days after your final work (or after the owner files a notice of completion). You must certify that a copy was served on the owner.Start the action within 2 years after filing the lien.MCA 71-3-531, 71-3-535, 71-3-562
NebraskaNone required of the prime. The notice of right to assert a lien (§52-135) is optional; it matters to subcontractors on owner-occupied homes.Record the lien within 120 days after your final work or materials.The lien stays enforceable for 2 years after recording, or less if the owner serves a written demand to sue (§52-140(2)).Neb. Rev. Stat. §§52-135, 52-137, 52-140
NevadaNo notice of right to lien for the prime. Residential: serve the owner a 15-day notice of intent to lien before recording (adds 15 days to the deadline).Record within 90 days after the later of completion or your last work (40 days after a notice of completion). Serve a copy on the owner within 30 days.Start the enforcement suit within 6 months after recording. A recorded extension agreement can extend this, up to 1 year.NRS 108.226, 108.227, 108.233, 108.245
New HampshireNone for a contractor hired by the owner. The lien arises automatically; the RSA 447:5 notice is for subcontractors.There is no lien filing. The lien lasts 120 days after your last work, and you must secure it by suing and attaching the property within that time.The suit with a writ of attachment must be served within the 120 days (RSA 447:10). After that, prosecute the suit to judgment.RSA 447:2, 447:9, 447:10
New JerseyResidential (1-3 family): record a Notice of Unpaid Balance within 60 days after last work, then demand arbitration within 10 days (§2A:44A-21).File the lien claim within 10 days after the arbitrator’s decision, and no later than 120 days after your last work.Sue within 1 year after your last work, or within 30 days after a written demand from the owner.N.J.S.A. 2A:44A-6, 2A:44A-14, 2A:44A-21
New MexicoNone for the original contractor. The 60-day preliminary notice (§48-2-2.1) is only for those who don’t contract with the owner.The original contractor files the claim of lien within 120 days after the contract is completed.Start suit (or binding arbitration) within 2 years after filing the lien.NMSA 1978 §§48-2-6, 48-2-10
New YorkNo notice before filing. Serve a copy of the notice of lien on the owner from 5 days before to 30 days after filing (§11).Single-family home: file the notice of lien within 4 months after completion or your last work (8 months for other property).Foreclose within 1 year after filing. For a single-family home, the lien can be extended only by court order.N.Y. Lien Law §§10, 11, 17
North CarolinaNone for the prime. A lien agent isn’t needed for improvements to an existing owner-occupied single-family home (§44A-11.1).File the claim of lien within 120 days after your last work or materials at the site.Start the enforcement action within 180 days after your last work or materials (not counted from filing).N.C.G.S. §§44A-11.1, 44A-12, 44A-13
North DakotaSend the owner notice of intent to claim a lien by certified mail at least 10 days before recording (to be safe: the text sits in the subcontractor paragraph).Record the lien within 90 days after your work is done.Notify the owner 10 days (in person) or 20 days (by mail) before suing. Sue and record a lis pendens within 3 years, or 30 days after the owner’s demand.N.D.C.C. §§35-27-02, 35-27-13, 35-27-24, 35-27-25
OhioNo pre-lien notice for a prime (notice of furnishing is for subs when owner records a notice of commencement). Serve copy of lien affidavit on owner within 30 days of filing.60 days after last work/materials for a 1- or 2-family dwelling or residential condo unit (75 days for other projects).Lien good 6 years from filing; if owner serves notice to commence suit, you must sue within 60 days or the lien is void.Ohio Rev. Code 1311.06(B)(1), 1311.07, 1311.11, 1311.13
OklahomaPre-lien notice (owner-occupied dwelling: no lien without it, due 75 days after last furnishing) is for claimants other than the original contractor. County clerk mails owner notice of lien.File lien statement with county clerk within 4 months after last labor or materials furnished.Sue to foreclose within 1 year after filing the lien statement.42 Okla. Stat. 142, 142.6, 143, 172
OregonResidential contract over $2,000: give owner the ’Information Notice to Owner About Construction Liens’ at signing, or no lien. Send notice of intent to foreclose 10+ days before suing.Record claim of lien within 75 days after you stop work or after completion; send owner notice of the claim within 20 days of recording.Sue to foreclose within 120 days after recording the claim of lien.ORS 87.093, 87.035, 87.039, 87.055, 87.057
PennsylvaniaNo preliminary or intent notice for a contractor in direct contract with owner (30-day notice of intent is for subs). Serve notice of filing on owner within 1 month after filing.File claim with prothonotary within 6 months after completing your work. Residential claims must exceed $500.Commence action to obtain judgment within 2 years after filing the claim.49 P.S. 1201, 1501, 1502, 1701
Rhode IslandBefore starting work, give owner the notice of possible mechanic’s lien (in the contract conspicuously, or certified mail). Without it a direct contractor has no lien.Mail notice of intention to owner (certified/registered) and record it in land evidence records within 200 days after doing the work.File complaint to enforce plus lis pendens within 40 days after recording the notice of intention.R.I. Gen. Laws 34-28-4.1, 34-28-4, 34-28-10
South CarolinaNo preliminary or intent notice for a prime contractor. The lien statement itself must be served on the owner.Serve owner and file sworn statement of account within 90 days after you last furnish labor or materials.Sue and file lis pendens within 6 months after you last furnished labor or materials (measured from last work, not filing).S.C. Code 29-5-90, 29-5-120
South DakotaNo pre-lien notice for a prime (notice of furnishing applies to sub-subs/suppliers). Mail a copy of the lien statement to the owner as a condition of filing.File lien statement with register of deeds within 120 days after doing the last work or furnishing the last item.Enforce within 6 years; if owner serves a demand to sue, you must sue within 30 days or lose the lien.SDCL 44-9-15, 44-9-17, 44-9-24, 44-9-26, 44-9-53
TennesseePrime need not send notice of nonpayment. Residential: only the prime has lien rights; give owner notice of potential residential lien claim (66-11-203; failure is a misdemeanor, lien survives).Record sworn notice of lien within 90 days after completion/abandonment (10 days if owner records a notice of completion on 1-4 family).Sue within 1 year after the improvement is complete or abandoned; within 60 days if owner serves a written demand to enforce.Tenn. Code 66-11-106, 66-11-112, 66-11-130, 66-11-146, 66-11-203, 66-11-206
TexasHomestead: written contract signed by owner (and spouse) before work starts and filed with county clerk, plus required disclosure; lien affidavit must say ’NOTICE: THIS IS NOT A LIEN...’.File affidavit by the 15th day of the 3rd month after the month your work was completed/terminated/abandoned (residential); send owner a copy within 5 days.Sue to foreclose within 1 year after the last day you could have filed the lien affidavit.Tex. Prop. Code 53.052, 53.055, 53.158, 53.254, 53.255
UtahEvery lien claimant incl. the original contractor must file a preliminary notice on the State Construction Registry within 20 days after starting work, or no lien.Record notice of lien within 180 days after final completion (90 days after a notice of completion); mail owner a copy within 30 days. Owner-occupied: include 38-11 removal statement.Sue to enforce within 180 days after recording the notice of lien.Utah Code 38-1a-501, 38-1a-502, 38-1a-701, 38-11-107
VermontNo pre-lien notice for a contractor in direct contract with owner (written notice to owner is only for those hired through a contractor).Lien lapses 180 days after payment for the last labor/materials became due unless a notice/memorandum of lien is filed with the town clerk in that time.Sue and attach the property within 180 days after filing the memorandum (or after payment becomes due if not yet due).9 V.S.A. 1921, 1923, 1924
VirginiaNo preliminary notice for a prime. Memorandum must certify a copy was mailed to the owner. Lien can’t cover work more than 150 days before your last day of work.Record memorandum within 90 days after the last day of the month you last worked, and no later than 150 days after completion or termination.Sue within 6 months after recording the memorandum or 60 days after the building is completed, whichever is later.Va. Code 43-4, 43-17
WashingtonResidential (4 or fewer units) job of $1,000+: give customer the RCW 18.27.114 disclosure statement before starting work, or no lien. Send owner copy of lien within 14 days.Record claim of lien within 90 days after you stop furnishing labor or materials.Sue to foreclose within 8 calendar months after recording, and serve the owner within 90 days of filing suit.RCW 18.27.114, 60.04.091, 60.04.141
West VirginiaNo pre-lien notice found for a general contractor in direct contract with owner. Confirm current notice-of-lien service rules.Record notice of lien with county clerk within 100 days after completing the general contract.Sue to enforce in circuit court within 6 months after filing the notice of lien.W. Va. Code 38-2-8, 38-2-34
WisconsinPrime who hires subs or buys from suppliers must put the lien-rights notice in the written contract (or serve it within 10 days of first work). Also 30-day notice of intent before filing.File claim for lien within 6 months after last furnishing labor or materials; give owner 30 days’ written notice of intent first.Sue to foreclose within 2 years after filing the claim for lien.Wis. Stat. 779.02(2), 779.06, 779.10
WyomingBefore taking any payment (incl. deposit), send owner written notice of lien rights (29-10-101 form) or lose the lien. Give 20+ days’ notice of intent before filing.File lien statement within 150 days after last work or materials (or substantial completion, if earlier).Sue to foreclose within 180 days after filing the lien statement.Wyo. Stat. 29-2-112, 29-2-107, 29-2-106, 29-2-109

Checked November 5, 2026, against each state's statute (linked; where the official site wouldn't load, a mirror of the current code such as Justia, FindLaw or public.law). Deadlines usually run from your last day of work or materials, not the invoice date. Many states shorten them if the owner records a notice of completion or sends a written demand to sue. Lien laws change often and the details matter: confirm with the statute, your county recorder or a construction lawyer before you rely on a date. This is not legal advice.

What to do at the start of every job

  • Find your state's up-front notice. Arkansas, Minnesota, Missouri, Oregon (over $2,000), Rhode Island, Washington ($1,000 or more) and Wyoming want a lien-rights notice to the owner at or before the start, or before you take any payment. Arizona wants a 20-day preliminary notice, Utah a filing on the state construction registry within 20 days, and Iowa a notice of commencement on the state registry within 10 days on residential jobs.
  • Get a written contract where the lien depends on it. Michigan requires a written residential contract that shows your license number. Texas homestead liens need a written contract signed by the owner (and spouse) before work starts and filed with the county clerk.
  • Write down your last day of work. Almost every filing deadline counts from it. A dated final invoice helps prove it.
  • Put a calendar reminder at half the deadline. If the customer still hasn't paid by then, talk to the county recorder or a lawyer while there's time left.

Liens and Settle

Settle doesn't file liens or send lien notices. It puts your license number on every estimate and invoice, records when the customer approved the estimate, dates every invoice and sends a pay link the customer can pay by card or bank, so you have a paper trail and fewer unpaid jobs. If your state needs a lien notice in the contract, attach it alongside the estimate. When a customer stops paying, our guide on what to do when a customer won't pay covers the steps before a lien.

Questions

How long does a contractor have to file a mechanic's lien?

It depends on the state, usually 60 to 180 days after your last day of work for a contractor hired by the owner. Hawaii is 45 days after completion, Ohio and Indiana 60 days on 1–2 family homes, California and Florida 90 days, Texas residential the 15th day of the third month after the month you finished, and Pennsylvania 6 months.

Can I put a lien on a house if the homeowner won't pay?

In every state, a contractor hired by the owner can usually lien the property for unpaid work on it, as long as the steps were followed: any required up-front notice, filing within the deadline, serving the owner and suing in time. Texas homesteads have extra contract requirements.

Do I need to send a preliminary notice if I contracted directly with the homeowner?

In most states, no: preliminary notices are for subcontractors and suppliers. The exceptions include Arizona (20-day notice), Utah (state registry within 20 days) and Iowa (residential notice of commencement), plus the states that want a lien-rights notice in the contract or before payment, like Minnesota, Missouri, Oregon, Rhode Island, Washington and Wyoming.

What are the mechanic's lien deadlines in Texas?

On a residential job, file the lien affidavit by the 15th day of the third month after the month your work was completed, terminated or abandoned, and send the owner a copy within 5 days. Sue within 1 year after the last day you could have filed. Homestead liens also need a written contract signed before work and filed with the county clerk.

What are the mechanic's lien deadlines in California?

A direct contractor records the lien after completing the work and within 90 days after completion (or 60 days after the owner records a notice of completion or cessation), then must sue to foreclose within 90 days after recording.

What are the mechanic's lien deadlines in Florida?

Record the claim of lien within 90 days after your last labor or materials and sue within 1 year after recording. Contracts over $2,500 on 1–4 family homes must include the lien notice in Fla. Stat. 713.015, and you need to serve a final contractor's affidavit at least 5 days before suing.

What are the mechanic's lien deadlines in New York?

For a single-family home, file the notice of lien within 4 months after completion or your last work (8 months for other property), serve the owner, and foreclose within 1 year. On a single-family home the lien can only be extended by court order.

What are the mechanic's lien deadlines in Pennsylvania?

File the claim with the prothonotary within 6 months after finishing your work, serve the owner notice of the filing within 1 month after filing, and start the action within 2 years of filing. Residential claims must be over $500.

Send invoices with a pay link so you never need a lien.

Free on iPhone. Unlimited estimates and invoices. 7 days of Pro to try talking your estimates in, and you cancel in two taps.

Download on the App Store

iPhone, iOS 17 or later. Questions? Text Nina: (818) 945-9686