Every job you finish carries some risk for years. The statute of repose is the date that risk finally ends, and it ranges from 4 years to none at all.
Most states set an outer limit, called a statute of repose, on lawsuits over defective work on a building or other improvement to real property, usually counted from substantial completion. It's 10 years in many states, including California (latent defects), Texas, Ohio, Minnesota, Illinois and Nevada; shorter in Tennessee (4 years), Virginia and Arkansas (5), Massachusetts, Michigan, North Carolina, Mississippi, Colorado and Idaho (6), Florida (7 since 2023), Arizona, Georgia and South Carolina (8); longer in Pennsylvania (12). New York and Vermont have no construction repose statute, and Kentucky's was struck down. Within that outer limit, ordinary deadlines from discovery still apply. Texas also allows 6 years for home work backed by its statutory warranty. This is general information, not legal advice.
Settle is a free iPhone app for solo contractors: estimates and invoices you text from the job, with a pay link for card, Apple Pay or bank. Get it on the App Store
Jump to your state: Alabama · Alaska · Arizona · Arkansas · California · Colorado · Connecticut · Delaware · District of Columbia · Florida · Georgia · Hawaii · Idaho · Illinois · Indiana · Iowa · Kansas · Kentucky · Louisiana · Maine · Maryland · Massachusetts · Michigan · Minnesota · Mississippi · Missouri · Montana · Nebraska · Nevada · New Hampshire · New Jersey · New Mexico · New York · North Carolina · North Dakota · Ohio · Oklahoma · Oregon · Pennsylvania · Rhode Island · South Carolina · South Dakota · Tennessee · Texas · Utah · Vermont · Virginia · Washington · West Virginia · Wisconsin · Wyoming
The statute of repose in every state
| State | Outer limit for defect claims | Source |
|---|---|---|
| Alabama | 7 years after substantial completion; covers builders, architects, engineers on improvements to real property | Ala. Code 6-5-221 |
| Alaska | 10 years after substantial completion or last act; exceptions (gross negligence, fraud, defect concealment) | AS 09.10.055 |
| Arizona | 8 years after substantial completion; +1 year if latent defect found in year 8 (max 9); contract-based claims | A.R.S. 12-552 |
| Arkansas | 5 years after substantial completion (property/contract); 4 years for personal injury | Ark. Code 16-56-112 |
| California | 10 years latent (CCP 337.15); 4 years patent (337.1); SB800 homes 10 years (Civ. Code 941) | Cal. CCP 337.15, 337.1 |
| Colorado | 6 years after substantial completion; +2 years if claim arises in year 5 or 6 (max 8) | C.R.S. 13-80-104 |
| Connecticut | 7 years (max 8) but 52-584a covers only architects/engineers/surveyors; no builder-specific repose | Conn. Gen. Stat. 52-584a |
| Delaware | 6 years from earliest of completion/acceptance/occupancy etc.; covers construction of improvements | 10 Del. C. 8127 |
| District of Columbia | 10 years after substantial completion (injury/damage from defective improvement to real property) | D.C. Code 12-310 |
| Florida | 7 years (SB 360, eff. 4/13/2023; was 10) from earliest of CO/TCO, completion cert, abandonment, etc. | Fla. Stat. 95.11(3)(b) |
| Georgia | 8 years after substantial completion; up to 10 if injury in year 7 or 8 (personal injury) | O.C.G.A. 9-3-51 |
| Hawaii | 10 years after substantial completion of improvement (or abandonment) | HRS 657-8 |
| Idaho | 6 years after final completion (tort and contract claims accrue then); covers improvements to real property | Idaho Code 5-241 |
| Illinois | 10 years from act or omission (design/construction of improvement to real property) | 735 ILCS 5/13-214 |
| Indiana | 10 years after substantial completion or 12 years after plans submitted, whichever first | Ind. Code 32-30-1-5 |
| Iowa | 10 years for residential construction; 8 years other improvements (2017 SF 413); from act/omission | Iowa Code 614.1(11) |
| Kansas | 10 years from act giving rise to claim (applies to all K.S.A. 60-513(a)(4) claims) | K.S.A. 60-513(b) |
| Kentucky | No enforceable repose: KRS 413.135 (7 years) struck down in Perkins v. NE Log Homes (Ky. 1991) | Perkins v. Northeastern Log Homes (Ky. 1991) |
| Louisiana | 5 years (peremptive) from recorded acceptance, or occupancy if none recorded; immovables generally | La. R.S. 9:2772 |
| Maine | No contractor repose; 10 years from substantial completion for architects/engineers only | 14 M.R.S. §752-A |
| Maryland | 10 years vs architects, engineers, contractors (20 years others) from first available for use | Md. Code, Cts. & Jud. Proc. §5-108 |
| Massachusetts | 6 years from earlier of opening to use or substantial completion + possession; tort claims | M.G.L. c.260 §2B |
| Michigan | 6 years after occupancy, use or acceptance; licensed architects, engineers, contractors | MCL 600.5839 |
| Minnesota | 10 years after substantial completion (to 12 if claim accrues in year 9-10); improvements generally | Minn. Stat. §541.051 |
| Mississippi | 6 years after written acceptance or actual occupancy/use, whichever first; anyone designing/building | Miss. Code §15-1-41 |
| Missouri | 10 years from completion (or occupancy permit date); design/construction providers only | RSMo §516.097 |
| Montana | 10 years after completion; +1 year if injury in 10th yr; improvements to real property generally | MCA 27-2-208 |
| Nebraska | 10 years from the act/omission (not completion); condos 5 years | Neb. Rev. Stat. §25-223 |
| Nevada | 10 years after substantial completion (AB 421, eff. 10/1/2019, retroactive); fraud excepted | NRS 11.202 |
| New Hampshire | 8 years from substantial completion; improvements to real property generally | RSA 508:4-b |
| New Jersey | 10 years after performance/furnishing of design or construction services | N.J.S.A. 2A:14-1.1 |
| New Mexico | 10 years from substantial completion (latest of usable, occupied, or contractor-set date) | NMSA 1978 §37-1-27 |
| New York | None: no construction statute of repose (repose bills proposed, not enacted) | N.Y. CPLR 214 (no repose statute) |
| North Carolina | 6 years from later of last act/omission or substantial completion; improvements generally | N.C.G.S. §1-50(a)(5) |
| North Dakota | 10 years after substantial completion; to 12 if injury in 10th year (tort only) | NDCC §28-01-44 |
| Ohio | 10 years from substantial completion, improvements to real property; +2 years if found late in period (max 12) | Ohio Rev. Code 2305.131 |
| Oklahoma | 10 years from substantial completion; tort actions over improvements to real property | 12 Okla. Stat. 109 |
| Oregon | 10 years from substantial completion for homes and small commercial; 6 years large commercial | ORS 12.135 |
| Pennsylvania | 12 years from completion, improvements to real property; injury in years 10-12 may extend to 14 | 42 Pa.C.S. 5536 |
| Rhode Island | 10 years from substantial completion for tort claims vs. builders/designers of improvements | R.I. Gen. Laws 9-1-29 |
| South Carolina | 8 years from substantial completion; covers contract and tort, any improvement to real property | S.C. Code 15-3-640 |
| South Dakota | 10 years from substantial completion, improvements to real property | SDCL 15-2A-3 |
| Tennessee | 4 years from substantial completion; injury in 4th year gets 1 more year (28-3-203), max 5 | Tenn. Code 28-3-202 |
| Texas | 10 years from substantial completion; 6 years for home work with statutory written warranty (from 9/2023) | Tex. CPRC 16.008-16.009 (am. HB 2024, 2023) |
| Utah | 9 years from completion for non-contract claims; 6 years from completion for contract/warranty | Utah Code 78B-2-225 |
| Vermont | None (a 6-year repose bill, H.589, died in 2026) | 12 V.S.A. ch. 23 (no repose statute) |
| Virginia | 5 years after the construction/services were performed; improvements to real property | Va. Code 8.01-250 |
| Washington | Claim must accrue within 6 years of substantial completion or end of services | RCW 4.16.310 |
| West Virginia | 10 years from work, starting at occupancy or owner acceptance; contract or tort | W. Va. Code 55-2-6a |
| Wisconsin | 7 years from substantial completion; damage in years 5-7 gets 3 years; express warranties excluded | Wis. Stat. 893.89 |
| Wyoming | 10 years from substantial completion, contract or tort; a late injury can get a short extension | Wyo. Stat. 1-3-111 |
Checked November 5 and 6, 2026, against each state's statute (linked; where the official site wouldn't load, a mirror of the current code such as Justia, FindLaw or public.law). Most repose statutes cover anyone who builds or improves real property, which includes repair and remodel work, but some list only designers or certain claims, and most have exceptions for fraud or concealment. A separate, shorter limit usually runs from when the owner discovers the defect. This is not legal advice.
What this means for a solo contractor
- Keep job records at least as long as your state's repose period. The approved estimate, the invoice, photos of finished work and any change orders are your defense if a claim comes years later.
- Write down the completion date. Most repose periods start at substantial completion or the owner's acceptance. A dated final invoice is good evidence of it.
- Talk to your insurer about the tail. Claims can arrive long after a policy ends. Ask how your general liability policy handles work finished before it was cancelled.
- Warranties can change the clock. An express warranty can create its own deadlines, and Texas shortens repose to 6 years for home work that comes with its statutory warranty.
Records in Settle
Settle keeps every estimate and invoice with the customer's approval time and the invoice date, and exports them to CSV, so you can keep a copy as long as you need it. It doesn't give legal advice or provide warranties.
Questions
How long is a contractor liable for their work?
Until your state's statute of repose runs out, usually 10 years after substantial completion, but anywhere from 4 years (Tennessee) to 12 (Pennsylvania). New York and Vermont have no repose statute, so only the ordinary limitation periods apply there.
What is the statute of repose for construction in Texas?
10 years from substantial completion. Since September 1, 2023, it's 6 years for work on a home if the contractor gives the statutory written warranty (at least 1 year on workmanship, 2 on mechanical systems and 6 on structural parts).
What is the statute of repose for construction in Florida?
7 years since a 2023 change (it was 10), counted from the earliest of events such as the certificate of occupancy, the certificate of completion or abandonment.
What is the statute of repose for construction in California?
10 years from substantial completion for latent defects and 4 years for patent (obvious) defects.
What's the difference between a statute of limitations and a statute of repose?
A statute of limitations usually runs from when the problem was discovered or the claim arose. A statute of repose runs from a fixed event, usually completion, and cuts off claims even if the defect hasn't been found yet.
Keep a dated record of every job you finish.